Home Addition Contractor in Livingston, TN: What to Ask Before You Sign

Crosland Construction logo - hand drawn home with blue background
Crosland Construction
Dog standing on newly built porch

Adding onto your home is exciting, but it is also one of the easiest projects to get sideways if the scope is fuzzy or the paperwork is thin. We have built and remodeled homes across the Upper Cumberland for years, and we have seen the same pattern: the homeowners who feel confident at the end are the ones who asked detailed questions at the beginning. If you are looking for a home addition contractor in Livingston, TN, this decision-stage checklist will help you compare bids apples-to-apples, reduce surprise costs, and protect your timeline.

In this guide, we will walk through what to ask about scope clarity, structural tie-ins to the existing home, allowances, schedule, the change order process for remodeling, and warranties. We will also share real-world scenarios we see in Livingston and the surrounding area, like older framing, crawlspace moisture, and matching rooflines on sloped lots.

If you want a local team that plans carefully and builds cleanly, we serve Livingston and the broader region from our base in Cookeville.

1) Start with scope clarity, because every other detail depends on it

Here is what we recommend you ask for and confirm in writing.

Ask: “Can you walk me through the scope line-by-line?”

Look for these items spelled out:

  • Room list and dimensions (for example, primary suite addition, mudroom, expanded kitchen)
  • Foundation type (slab, crawlspace, basement tie-in)
  • Framing and insulation (wall thickness, insulation levels, air sealing approach)
  • Exterior finishes (siding match, brick tie-in, trim profiles)
  • Interior finishes (flooring, paint, trim level, doors)
  • MEP scope (mechanical, electrical, plumbing, plus HVAC ductwork changes)
  • Site work (grading, drainage, driveway adjustments, utility trenching)

Ask: “What is specifically excluded, and what commonly surprises homeowners?”

We prefer an exclusions list because it removes ambiguity. In the Upper Cumberland, common exclusions that can matter on additions include:

  • Septic modifications or a septic capacity review
  • Well line relocation or pressure tank upgrades
  • Upgrades to the existing electrical panel when load increases
  • Mold remediation or rot repair discovered during demo
  • Specialty matching materials (older brick blends, discontinued siding)

Ask: “What drawings and specs are you pricing from?”

If one contractor is pricing from a detailed plan set and another is pricing from a sketch, the numbers will not be comparable. For additions, we like to see at least:

  • Floor plan and elevations
  • Framing notes or structural sheets
  • Window and door schedules
  • Basic electrical and plumbing layouts

If you are still early, our Home Design and Planning process is designed to tighten up these details before you commit to a final contract.

2) Structural tie-ins: the most important “hidden” part of an addition

Ask: “How will you tie the new foundation into the existing foundation?”

The right approach depends on the existing home. In Livingston, we often see crawlspaces, mixed foundation types, and homes that have settled slightly over time.

  • How elevations will be matched so floors feel level
  • How the connection will be reinforced (rebar dowels, keyed joints, engineered connectors, as applicable)
  • How water will be managed at the joint (flashing, waterproofing, drainage)

If a contractor glosses over this, push for specifics. Foundation tie-ins affect cracks, door alignment, and long-term performance.

Ask: “Who is responsible for engineering and permits?”

Many additions require structural review, especially if you are removing load-bearing walls, adding a second story, or altering roof structure. Depending on the project, we may coordinate with an engineer and build to stamped details.

Also ask how inspections will be handled and who schedules them. Even when you are working with a local crew, inspection timing can impact the schedule.

Ask: “How will you handle roofline tie-ins and water shedding?”

Roof intersections are a common leak point when they are rushed. We like to talk through:

  • Valley locations and flashing method
  • Ice and water shield placement and underlayment
  • How gutters and downspouts will be rerouted
  • How we will match roof pitch and shingle type, or plan a clean transition

In the Cumberland Plateau area, heavy rain events are not rare. A solid water management plan is not optional.

3) Allowances and selections: the fastest way to blow a budget

If you are comparing bids, allowances can make one estimate look cheaper without actually being cheaper. An allowance is a placeholder number for a selection that is not finalized yet, like tile, lighting, cabinets, or plumbing fixtures.

This is where an addition estimate checklist becomes your best friend.

Ask: “What items are allowances, and what dollar amount is assigned to each?”

Request a written allowances schedule. It should list each category and the assumed amount, such as:

  • Cabinets and hardware
  • Countertops
  • Flooring
  • Tile and waterproofing systems
  • Plumbing fixtures
  • Lighting fixtures
  • Interior doors and trim package

Then ask how those allowances were chosen. We base allowances on realistic mid-range selections that we see homeowners pick in our market, not on the lowest possible numbers.

Ask: “What happens if my selections are above or below the allowance?”

The contract should explain exactly how overages are calculated. A transparent contractor will tell you:

  • Whether you pay only the difference in material cost
  • Whether labor changes are included (some selections increase install time)
  • Whether contractor markup applies, and at what percentage

Ask: “Can you help me pre-select the big-ticket finishes before final pricing?”

For additions, the biggest budget swings usually come from:

  • Cabinets and countertops
  • Windows and exterior doors
  • Flooring and tile choices
  • Plumbing fixtures (especially custom showers)

If you lock these early, you reduce the number of allowances and the number of decisions you have to make mid-build. Our Home Renovations and Additions approach focuses on preconstruction planning so the build phase is calmer.

4) Schedule and jobsite logistics: protect your daily life and your move-in date

Homeowners often ask, “How long will it take?” A better question is, “How will you plan the schedule, and how will you keep it on track?”

Ask: “Can you provide a projected timeline with major milestones?”

We like to outline milestones such as:

  1. Preconstruction, permits, and ordering long-lead items
  2. Demo and temporary protection
  3. Foundation and framing
  4. Dry-in (roofing, windows, exterior doors)
  5. Rough-ins (plumbing, electrical, HVAC)
  6. Insulation and drywall
  7. Trim, cabinets, tile, and paint
  8. Final fixtures, punch list, and inspections

Ask: “What are the long-lead items, and when will they be ordered?”

Windows, specialty doors, cabinets, and certain HVAC equipment can take weeks. If ordering is delayed, the whole project can stall.

We recommend asking:

  • What items are long-lead for your specific addition
  • Who is responsible for ordering (contractor vs homeowner)
  • What happens if a selection is not made by a deadline

Ask: “How will you protect the existing home during construction?”

Living through an addition is doable, but only if containment is planned. Ask about:

  • Dust control (zip walls, negative air when needed)
  • Floor protection and daily cleanup
  • Temporary weather protection during openings
  • Safe pathways for your family and pets

In older homes, opening an exterior wall can reveal surprises like nonstandard framing or previous DIY work. The contractor should plan for temporary bracing and weatherproofing so you are not left with a tarp solution.

5) The change order process: get it in writing before changes happen

Even with great planning, changes happen. You might decide to add a window, upgrade flooring, or adjust a wall location once you see the space framed. The key is having a clear change order process for remodeling so the cost and schedule impact are understood before work proceeds.

Ask: “What triggers a change order, and who can approve it?”

  • Owner-requested changes (you change your mind)
  • Unforeseen conditions (hidden rot, plumbing not to code)
  • Plan revisions (architect or engineer updates)

Also clarify who can approve changes. We recommend that only the homeowners listed on the contract can sign off, in writing.

Ask: “How will pricing be calculated for changes?”

Change orders should show:

  • Material costs
  • Labor hours or unit pricing
  • Any equipment or subcontractor costs
  • Markup, if applicable
  • Schedule impact (added days)

If a contractor says, “We will just settle up at the end,” that is a risk. Changes should be documented as they occur.

Ask: “How do you handle hidden conditions, and what is your documentation process?”

In Livingston, we sometimes find:

  • Moisture issues in crawlspaces
  • Termite damage in sill plates
  • Old wiring that needs correction when circuits are extended

6) Quality standards: how you will know the addition is built right

Homeowners often focus on finishes because they are visible, but quality is also in the details you do not see after drywall.

Ask: “What building standards do you follow for framing, waterproofing, and air sealing?”

You do not need to be a code expert, but you should hear language that reflects best practices. For example:

  • Proper flashing at windows and doors
  • Continuous water-resistive barrier integration
  • Correct fasteners and connectors where required
  • Good air sealing strategy around penetrations
  • Bathroom waterproofing systems that are designed for wet areas, not just tile and grout

Ask: “How will you match the existing home so it looks intentional?”

  • Matching roof pitch, soffit depth, and fascia details
  • Window style and trim proportions
  • Siding reveal and corner details
  • Interior transitions (floor height, trim profiles, door styles)

We often advise homeowners to decide early whether the goal is a seamless match or a complementary contrast. Either can look great, but it should be planned.

Ask: “Who is supervising the project day-to-day?”

You should know who your point of contact is and how often they will be on site. Consistent supervision reduces rework, keeps subs coordinated, and helps the schedule.

If you are also evaluating builders for larger projects, you can review our broader Residential Construction Services to see how we manage projects from planning through completion.

7) Warranty and closeout: what happens after the final payment

Ask: “What warranty for a home addition do you provide, and what is excluded?”

Get the warranty terms in writing. Ask what is covered for workmanship, and ask how manufacturer warranties are handled for products like:

  • Roofing
  • Windows
  • HVAC equipment
  • Plumbing fixtures

Also ask about typical exclusions, such as damage from homeowner neglect, extreme events, or normal wear.

Ask: “What does closeout include?”

  • Final inspection sign-offs
  • Punch list completion
  • Warranty documentation
  • Care and maintenance guidance for new materials

We also recommend asking about a post-completion check-in. Many small issues, like a sticky door or minor nail pops, show up after the home goes through seasonal changes.

A practical checklist to compare contractors in Livingston

When you are ready to hire a contractor in Livingston, TN, use this quick comparison list when reviewing proposals and meetings. It helps you spot gaps that can become change orders later.

Estimate and scope

  • Detailed written scope with inclusions and exclusions
  • Drawings and specs clearly referenced
  • Allowances listed with realistic numbers

Structural and technical planning

  • Clear plan for structural tie-in to the existing home
  • Roof and water management plan explained
  • Permit and inspection responsibilities defined

Schedule and communication

  • Milestone timeline and long-lead ordering plan
  • Jobsite protection plan if you are living in the home
  • Named point of contact and communication cadence

Money and changes

  • Written change order process remodeling details
  • Payment schedule tied to milestones, not vague dates
  • Documentation expectations for unforeseen conditions

Warranty and closeout

  • Warranty for home addition in writing
  • Closeout process and punch list expectations

If a contractor can answer these questions clearly and consistently, it is a strong sign they have built additions before, not just talked about them.

Conclusion: a better addition starts with better questions

If you are comparing options for a project in Livingston or anywhere in the Upper Cumberland, we would be glad to talk through your goals and give you a straightforward plan. Explore our Home Renovations and Additions service to see how we approach additions from preconstruction through closeout, then reach out when you are ready to price your project with confidence.

Frequently Asked Questions

Start by aligning the scope, allowances, and exclusions. Ask each contractor to list allowances by category (cabinets, windows, flooring, fixtures) and to confirm what is excluded (site work, panel upgrades, septic work, rot repair). If one proposal is based on detailed plans and the other is based on assumptions, the lower number often grows through change orders.